![DL/T5210.4-2009电力建设施工质量验收及评价规程第4部分:热工仪表及控制装置(英文版)](https://wfqqreader-1252317822.image.myqcloud.com/cover/49/33689049/b_33689049.jpg)
4.5 Installation of Local Inspection and Control Instrument
4.5.1 Quantity for acceptance inspection.
1 Important instruments and equipments with high temperature,high pressure,negative pressure,water level,attacking media,flow and being combustible,explosive and toxic shall be inspected 100%.
2 Those instruments with general parameters shall be randomly inspected 30% according to the systems and functions respectively.
4.5.2 Installation of pressure/differential-pressure indicating instrument and transmitter.
1 Installation inspection and acceptance of local indicating pressure gauge are detailed in Table 4.5.2-1.
Table 4.5.2-1 Installation of local indicating pressure gauge
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_157.jpg?sign=1738978160-H8fJQMuJ5PO0uo7FKxcfoA5WrFuo4PdQ-0-a58fd5b9445269e5cb59fa56e63e381b)
2 Inspection and acceptance of indicating pressure gauge with signal contact are detailed in Table 4.5.2-2.
Table 4.5.2-2 Installation of indicating pressure gauge with signal contact
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_158.jpg?sign=1738978160-AsXP6zmV5GTCDe4OIVn8PbBqE4QPVqHQ-0-98dc1dbf9d5e639999be8eebfddd5f33)
3 Installation inspection and acceptance of local differential-pressure indicating instrument are detailed in Table 4.5.2-3.
Table 4.5.2-3 Installation of local differential-pressure indicating instrument
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_159.jpg?sign=1738978160-TwXvFuiKnBWtEm2qmkCL7mtMfmwK5efq-0-24af4b52d7204c2e0319f15a5b7b961d)
4 Installation inspection and acceptance of differential-pressure indicating instrument with signal contact are detailed in Table 4.5.2-4.
Table 4.5.2-4 Installation of differential-pressure indicating instrument with signal contact
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_160.jpg?sign=1738978160-UGhkzmNC7NeLLGaaf5IS9iEmVVTC9hD4-0-e84ebd7ee7ad97f79223f3ffe08d0d26)
Table 4.5.2-4(Continued)
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_161.jpg?sign=1738978160-oUm1UiN9ISNrp6VZYxhwpLfHp1Mp4iYB-0-1ef8172f0ac439d3a9baae9f830a6b6d)
5 Installation inspection and acceptance of transmitter are detailed in Table 4.5.2-5.
Table 4.5.2-5 Installation of transmitter
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_162.jpg?sign=1738978160-ps87NNnM3ymT7NmtlxUpgO2FnAhTi5Lw-0-cd8a0e031bb8091eb8da8ca4e504d6ff)
4.5.3 Switching value instrument.
1 Installation inspection and acceptance of temperature switch are Table 4.5.3-1.
Table 4.5.3-1 Installation of temperature switch
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_163.jpg?sign=1738978160-rgDUtrwTSS7fo5ByTAjcoMsOPsrxtNnp-0-3142b2258352f56d9730a48f85a49d29)
2 Installation inspection and acceptance of pressure and differential pressure switches are detailed in Table 4.5.3-2.
Table 4.5.3-2 Installation of pressure and differential pressure switches
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_164.jpg?sign=1738978160-XLC8wFYi4XnPRiCGsYf8ZKUM57ZHKdDF-0-b3686304b57bfdba0f524950f336169c)
3 Installation inspection and acceptance of flow switch are detailed in Table 4.5.3-3.
Table 4.5.3-3 Installation of flow switch
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_165.jpg?sign=1738978160-ANoCuz536dT6e957fMJF9IxORue9MRp8-0-fd54d896cae8adf9de85338ac06a4dd5)
4 Installation inspection and acceptance of level switch are detailed in Table 4.5.3-4.
Table 4.5.3-4 Installation of level switch
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_166.jpg?sign=1738978160-rryVid0UQsK0nefmFddR1AJQgZspXnC6-0-1ca55373688327a91cc77a107fba2679)
5 Installation inspection and acceptance of travel switch are detailed in Table 4.5.3-5.
Table 4.5.3-5 Installation of travel switch
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_167.jpg?sign=1738978160-KcSYdOSkTanFoYUuIrtrJpUw3wTwRBo8-0-ef854698bb43921c787dba8937c1c8f9)
4.5.4 Analysis instrument.
1 Installation inspection and acceptance of gas composition analysis instrument are detailed in Table 4.5.4-1.
Table 4.5.4-1 Installation of gas composition analysis instrument
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_168.jpg?sign=1738978160-s8FvVjrroBVcdyRqTgROZvGRiWh5mrAi-0-9f4c5d854a0eaf3dadd6cdccb7c21250)
2 Installation inspection and acceptance of steam-water analysis instrument are detailed in Table 4.5.4-2.
Table 4.5.4-2 Installation of steam-water analysis instrument
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_169.jpg?sign=1738978160-EEy35AvduXL9dt2pdYMyxBaCGKcWieKH-0-4a5e30821b085f0c10a18443623298fb)
3 Installation inspection and acceptance of steam-water analysis station are detailed in Table 4.5.4-3.
Table 4.5.4-3 Installation of steam-water analysis station
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_170.jpg?sign=1738978160-bze1ur69cULOFURhM6zPjNMBbQsZDNZm-0-760a7de61bd7c51292584025ca930953)
4.5.5 Actuator.
1 Installation inspection and acceptance of motor-driven actuator are detailed in Table 4.5.5-1.
Table 4.5.5-1 Installation of motor-driven actuator
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_171.jpg?sign=1738978160-xY12tz5j0JvrclvJD0Fq8Kiu1gICmu9p-0-04c079ad5a81a65c44cf7035346c4ab8)
2 Installation inspection and acceptance of pneumatic actuator are detailed in Table 4.5.5-2.
Table 4.5.5-2 Installation of pneumatic actuator
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_172.jpg?sign=1738978160-eUtibfxz9nWXaDgvW1UPI45WqacCbcOA-0-6d1b2e786ac713b1f69991562c5c8979)
3 Installation inspection and acceptance of motor-driven valve's motor are detailed in Table 4.5.5-3.
Table 4.5.5-3 Installation of motor-driven valve's motor
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_173.jpg?sign=1738978160-8KuuVgVaDG75qmgXlzvvTXLM1abLim7i-0-174c6e92094cec5ab4cf16957f85c2fe)
4 Installation inspection and acceptance of driving arm are detailed in Table 4.5.5-4.
Table 4.5.5-4 Installation of driving arm
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_174.jpg?sign=1738978160-0Ebq2EutG8PS3jhxrP6XAJGRgCGYt3WV-0-ab7e78600ad8fdc07c3bc34065520518)
5 Installation inspection and acceptance of solenoid valve are detailed in Table 4.5.5-5.
Table 4.5.5-5 Installation of solenoid valve
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_175.jpg?sign=1738978160-doh0fCRcHXXBtQDDJBrVkDVbdWrdgPEz-0-1a7ed138b57c24b326f34bf404d6c21d)
6 Installation inspection and acceptance of the control system for vibration coal feeder are detailed in Table 4.5.5-6.
Table 4.5.5-6 Installation of the control system for vibration coal feeder
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_176.jpg?sign=1738978160-1BWpEMkULT5ycDHeHC6e3H5wMVUmeeQk-0-5f94fe814be026f089fd04bbaa9ae6a5)
7 Installation inspection and acceptance of the control system for pneumatic control valve are detailed in Table 4.5.5-7.
Table 4.5.5-7 Installation of the control system for pneumatic control valve
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_177.jpg?sign=1738978160-c6KYhpny6HYBaEn6JxWEv7ydLqSHllBY-0-81e5052b3053d8d97b3896ceb8bbb402)
4.5.6 Pneumatic local-mounted instrument.
1 Installation inspection and acceptance of pneumatic local-mounted instrument are detailed in Table 4.5.6-1.
Table 4.5.6-1 Installation of pneumatic local-mounted instrument
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_178.jpg?sign=1738978160-Fkoj3DPA089j8bWMXTPXx9fTCXN4f8wT-0-b0fc238a9b18cb9842c3a75aa2e3bff9)
2 Installation inspection and acceptance of PLC are detailed in Table 4.5.6-2.
Table 4.5.6-2 Installation of PLC
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_179.jpg?sign=1738978160-E3bv8HDCNTHRJ4A5S6XA5h7OSnaWiVAs-0-0c20285e8b52668d45af7107ff5661e3)